Coal evacuation from Talcher coalfields got a major boost with the inauguration of the 14-km-long Angul-Balram rail link, which would enable Mahanadi Coalfields Limited (MCL) to increase daily despatch of coal to the consumers by about 40 thousand tonnes. Constructed at a cost of Rs.300 crore
Trending
- China Slams Trump’s Tariff Threat to BRICS Nations: “We Oppose Coercion Through Tariffs”
- Senate’s “Most Dangerous” Tax Bill Sparks Outrage as Democrats Unite Against Billionaire Bailout
- Paramount’s $16 Million Settlement with Trump Over ‘60 Minutes’ Lawsuit
- Cricmax Connect: Powering the Organic Growth of Cricket in America
- Political Constraints and Losses in Operation Sindoor – Why the Silence?
- India’s Operation Sindhu: Rescuing Thousands from Iran-Israel Conflict
- India Rejects Pakistan’s Court of Arbitration, Upholds Indus Waters Treaty
- The Golf GTI EDITION 50: Fastest Volkswagen Ever on the Nürburgring